This project consisted of two sites: Whitcomb Bayou and Kreamer Bayou. The eastern and southern shorelines along both bayous were experiencing significant erosion over a long period of time. This erosion was threatening the adjacent roadways that are important transportation corridors for the city as well as critical hurricane evacuation routes. The intent of this contract was to install revetment along the shorelines to reduce future bank erosion.  Work under this contract included: clearing and grubbing; excavation; installation of 3,000 cubic yards of granite rip rap; installation of 1,400 feet of 9’ long steel sheet pile; installation of 205 feet of 37’ long steel sheet pile; installation of 1,605 feet of cast in place concrete cap along the eastern and southern shorelines of Whitcomb Bayou and Kreamer Bayou. 

PROJECT INFORMATION

Project:               CAP Section 103, Whitcomb and         

           Kreamer Bayous Revetment Project                              

Location:             Tarpon Springs, FL                                

Contract Type:     Unit Price

Owner:                   U.S. Army Corps of Engineers

Owner’s Rep:         Erin Duffy, Contracting Officer

Phone:                (863) 471-1741                                       

Email:                  Erin.M.Duffy@usace.army.mil

 

Type:                          Shoreline Restoration                        

Capacity:                    Prime Contractor        

Value:                         $2,303,936.62                                            

Engineer:                   U.S. Army Corps of Engineers

Completion Date:      January 2014