Pass A Grille Way Utility Reconstruction
The improvements under this contract consisted of replacing all the existing utilities through the right of way including potable water, reclaimed water, sanitary sewer main, storm water, sea wall outfalls, as well as providing new conduit for all the communication and electrical through the project. The roadway was then completely rebuilt with new curb and sidewalks on both sides.
Some of the major scope elements for the utility improvements included:
3,700 LF of 18” sanitary sewer pipe
7,200 LF of 18”-30” storm drain pipe
187 storm inlet structures
11 storm water baffle boxes & seawall penetrations
4,600 LF of 16” reclaimed water main
4,500 LF of 16” potable water main
4,400 LF of 8” potable water main
114,000 LF of conduit pipe
All utilities had to be replaced while keeping the existing utilities active so there would be no interruption of service.
The major scope elements for the roadway improvements included:
22,000 SY of road building
3,000 TN of asphalt placement
11,100 LF of curb
7,100 SY of sidewalk
300 SY of Augusta brick pavers
The roadway had to be rebuilt while maintaining traffic in both directions, with limited detours along a 55’-60’ wide corridor, forcing the road to be built one lane at a time. Other improvements included retaining walls, pavement markings, signage and sod.
Project Details
Project: Pass A Grille Way Phase 1
Location: St. Pete Beach, Florida
Owner / Client: St. Pete Beach
Construction Area: 4,600 LF
Contract Value: $11,090,596
Date Completed: December 2018